Munich
Full time
On-site
Stellarator Engineering
Proxima Fusion is Europe’s fastest-growing fusion company and the continent’s best-funded fusion player, as well as the first spin-out from the Max Planck Institute for Plasma Physics (IPP). Backed by over €650M and powered by a growing team across Munich, Zurich, and Oxford, we are developing the hardware and infrastructure needed to deliver the world’s first commercial stellarator fusion power plant.
Our concept advances the most mature fusion technology out there, the Wendelstein 7-X stellarator, through two next-generation machines: Alpha and Stellaris. Our work combines stellarator optimization, advanced computation, machine learning, and high-temperature superconducting magnets to unlock higher-performance designs that were previously out of reach.
Turning these designs into a functioning fusion power plant requires excellence and ownership across every discipline, from physics and engineering to software, manufacturing, law, and business functions.
Shape the architecture of the world’s first commercial fusion power plant – Own system-level decisions that determine how a first-of-a-kind energy technology is designed, integrated, and ultimately deployed at scale.
Solve some of the most complex engineering challenges – Work across tightly coupled disciplines (plasma physics, magnets, cryogenics, manufacturing, controls, and more) to resolve critical trade-offs and turn cutting-edge science into a functioning product.
Design real hardware with a pragmatic, fast-moving team from all over the world – Combine advanced simulation and systems thinking with a strong execution mindset, focusing on practical engineering solutions that accelerate the path to commercial fusion energy.
You will deliver the helium refrigerator and cryogenic distribution for Proxima's Alpha coil test facility, taking these systems from requirements and process design through procurement, installation and commissioning. You will also support the engineering of the refrigerator for the cryopumps of the neutral beam injectors and divertor, and act as the process and safety owner for these systems.
Own the cryogenic supply infrastructure for the Alpha coil test facility, covering the main refrigerator, liquid nitrogen equipment, cryogenic distribution and interconnecting valve box, from concept to commissioning and test operation.
Define requirements, process flow diagrams and P&IDs for cryogenic refrigerators and ancillary systems such as helium storage tanks, LHe dewars, purification and gas recovery.
Size lines, valves and pressure relief devices based on your relief case definitions, in line with PED and relevant EN/ISO standards.
Write specifications and RFQ packages, evaluate offers, and act as expert customer for suppliers through design reviews, FAT, installation and site acceptance.
Plan and lead installation and commissioning, write operating procedures, and support operation on site close to Munich.
A team player who loves challenges and is not afraid to experiment, take risks and learn from mistakes.
A proven track record of designing, building and commissioning cryogenic or similar gas systems in industrial plants, test facilities, accelerators, or space infrastructure.
Hands-on experience developing P&IDs, sizing pressure relief devices to recognised standards (e.g. ISO 21013, ISO 4126), and using process or system simulation tools such as EcosimPro or Aspen HYSYS for helium refrigeration plants or similar.
Experience with pressure equipment design to EN 13445 or AD 2000, and with CAD.
Proficiency with programming languages used in science and engineering (particularly Python) is highly beneficial but not essential.
Demonstrated ability to manage the delivery of complex systems with external suppliers to schedule and budget.
Recruiter Interview (30-60 min)
Technical Screening (30 min)
Technical Panel (3x60 min)
CEO call (30 min)
This role sits at L2/L3/L4 of our framework, please inquire during the recruitment process for further information.
Zero Waste als Beruf: 120 Stellen in der Kreislaufwirtschaft, 14 davon an der Anlage
10 min read